LA PLATA — The town’s buildings need about $10.5 million in deferred repairs, and one of them would cost more to fix than to rebuild, according to a draft facilities master plan presented to residents at Town Hall.
Consultants from Michael Baker International walked residents through three years of building inspections, staffing interviews and cost estimates at a public outreach meeting. Town Manager Chuck Stevens opened by telling the room that no decisions would be made. “Tonight we are not making decisions,” he said, calling the session a chance to gather feedback on a draft the town expects to lean on for years.
The town is accepting comments through a questionnaire, email and in-person visits for about a month, into December, Stevens said.
What the inspections found
A team of architects and engineers inspected the buildings the town owns and operates from, including Town Hall, the police facilities, the public works site and the wastewater plant’s administration building. They logged code and accessibility problems, rotting door frames that let in moisture, structural cracks, broken pavement and failing mechanical systems. The key figures:
- Replacement value of the town’s building portfolio: about $37.6 million.
- Replacement value of Town Hall: about $19.5 million, rated in fair condition.
- Adjusted deferred maintenance across the portfolio: about $10.47 million, not counting the former Dorchester Community Center.
- Facility condition index at 402 Potomac Ave.: 103.47%, meaning repairs would exceed the cost of replacing the building.
The consultant said much of the 402 Potomac Avenue figure comes from pavement repair, and that costs can be spread over several years. The police annex’s evidence storage and the Dorchester Community Center also showed significant deterioration. The council has already decided to demolish the community center and replace it, the consultant said.
His main conclusion was that fixing everything in place is not necessarily the best use of town money. A building can be physically repairable and still wrong for long-term town operations.
Crowded offices and split departments
The space study found police functions divided across several buildings. The department has a small surplus of space today but is projected to run short within five years. Town Hall’s third floor is largely archive storage, and the consultants suggested digitizing records to free it up.
At public works, the deputy director shares a small parts storage room with a mechanic. The newly created engineering department is due to move into a residence on St. Mary’s Avenue by January, and the consultants said it will outgrow the space soon after. The wastewater plant’s administration building has a small surplus now but is projected to fall short by 2031.
Town staff now number about 92 and are projected to reach 115 by 2051, with growth concentrated in particular departments rather than spread evenly.
Three strategies, none chosen
The plan sorts options into three strategies that can be mixed: invest in buildings worth keeping, consolidate related functions into hubs, and build or replace for long-term growth. The consultants stressed that the drawings are concepts used to price options, not commitments.
Among the ideas floated:
- A police and public safety hub on town-owned parcels near Town Hall, with secure parking.
- A Town Hall annex and added parking, with the rest of the South Maple Avenue property reassigned to community use.
- A development services cluster that could combine planning, inspections and code enforcement, and engineering.
- Replacement of the Dorchester Community Center and the Potomac Avenue warehouse, and folding 111 N. Maple Ave. into a proposed Charles County public library campus.
- Security fencing with intrusion detection at the public works site, after what the consultant described as a recent attempted break-in.
- Keeping the Monterey Place parcel flexible while the town completes environmental, utility and market studies. The consultant said mixed-use commercial development is likely the best fit.
The consultant said the first two priority tiers of work, immediate action and near-term capital projects, account for roughly 55% of the deferred maintenance. The plan urges the town to address life-safety and failed-system needs first and to start feasibility studies for the major projects.
What comes next
Comments from the public and the town’s planning advisory committee will shape a preferred alternative, which will be folded into a recommended master plan. Cost, funding options and affordability for the capital improvement program come after that. Stevens said he expects to cite the final report whenever he brings capital plans to the Town Council.
The study arrives as La Plata is already committing to large projects. In October the council approved a state agreement for a $16.3 million Charles Street upgrade, and earlier this year the town said it would push forward on a youth center. The full Phase 2 condition report runs about 352 pages and is expected to be posted for public review.